Saturday, January 21, 2006

Temp Feet, Drilled Holes for Rails and Ankles

I tried making some temporary feet to start getting R2 on all threes, but I think I made them too small, and I'll have to try again. "Measure zero times, cut many."



I finally got around to drilling the frame to support the center leg rails. The rails will sit on a couple of pieces of 1/2" plywood at the front and back of the frame. So I drilled those pieces of plywood and the frame bottom. Bolts connect the rails to the frame, t-nuts are inserted on the underside of the frame.



Finally, I drilled the holes in the ankles for the bolts that will secure the feet. The holes are 1/2", I'll insert a 1/2"->3/8" reducer for the bolt to pass through.

Thursday, January 19, 2006

Finished JB Welding Back Door

I finished JB Welding the last three panels of the back door today. I probably overdid it with the JB Weld, but the stuff is kind of messy and hard to work with in my opinion. Still, for the back door I wanted the parts JB Welded together. Other panels on the rest of the skins will either be siliconed in or taped in.




I also fixed a vent insert that got loose in the front vents, and cut out another coin return (haven't folded it yet, too tired tonight).

Wednesday, January 18, 2006

More Back Door JB Welding, More Coin Returns

I JB Welded four panels on the back door (the largest and three smallest). The top panel was held in with my little paper clip clamps since it is such a large area to bond, the smaller panels are affixed with blue painter's tape on the front.



I also made two more coin returns. I've made four total, one is unusable, these three may or may not be acceptable. I will probably try building a few more until I get it right, we'll see.

Tuesday, January 17, 2006

Started JB Welding Back Door

A marathon 3 1/2 hour session of JB Welding the inner and outer skins that make up the back door. Most of the time was spent cleaning up JB Weld that would slowly ooze from the seams. What a pain that was.



Gee, I sure hope I used enough clamps... (117 by my count, beat that! If you do, it probably means you are insane.)

Monday, January 16, 2006

Coin Returns Try #2

More incontrovertible proof that nothing's easy when it comes to building R2. I had another try at making a coin return, and this one turned out somewhat better than yesterday's attempt. I found some thinner aluminum at Ace Hardware. It was ducting, but the coin returns are small enough that the curve doesn't really come into effect. I'm just making the inset piece, not the frame so far.

By the way, these are built using Chris Lee's extremely helpful tutorial, Making aluminum coin returns.

I have a feeling there are going to be several attempts to get them right. (It would probably help if I started working on them before 10:30pm too.)

Sunday, January 15, 2006

Finished Painting Skins (Really), Prototype Coin Return

I finished painting my skins for real today this time, I don't see anything but white now.



I also took a shot at creating a coin return, but it didn't turn out so hot. So let's just call it a prototype. I think I need thinner aluminum. You get the good, the bad and the downright ugly here.

Saturday, January 14, 2006

A Bit More Painting

I got disappointingly little done today. I realized that I had forgotten about the smaller cutout pieces on the back door that need painting, so I prepped and painted them. I also sanded and applied a couple of more coats of the primer to the legs, still trying to get the last remnants of wood grain to disappear. Later I picked up some stuff from Home Depot (more paint & primer, silver tape, t-nuts, etc.) for various activities that will need doing as I move forward.

Friday, January 13, 2006

More Parts Arrive, More Painting

The rest of the budget feet parts and ankle bracelets that Anna sent arrived today, along with some bushings for the foot screws I purchased from McMaster Carr.



"Finished Painting Skins." Did I actually write that earlier? I should know better. I'm never finished with anything. Despite what I thought were enough coats the other day to cover the skins completely, I could see some aluminum (or primer) showing through, so I gave the skins another few coats of Rustoleum Satin White today. This mostly did the job, but I still can see some hints of metal color on a few spots. So yet more painting to come. In the meantime I set the front skins next to my frame.

Wednesday, January 11, 2006

Cut Shoulder Bolts Down, Replaced T-Nut

Today wasn't too exciting (unlike all the other days...). I used the angry jigsaw blade that cut the gas pipe, to trim down the various bolts that go on my shoulder wheel in order to make room for the shoulder hub that will one day encroach on the area. (See Finished Drilling Shoulder Discs.) I also had to replace a loose t-nut in the shoulder. It took a while, but eventually I got the job done. No pictures today, too boring.

Tuesday, January 10, 2006

Finished Painting Skins

I couldn't wait until the weekend, so I finished painting the skins tonight in the garage. There's never enough ventilation... who said that?!

Sunday, January 08, 2006

Coin Slots Fitted, More White Panel Painting

Due to the way I placed the horizontal rib immediately below the coin slots on my wooden frame, I needed to sand down the resin coin slot part, and Dremel out a bit more wood from the rib itself. After that, the part fit into the skins just fine.



I also finished painting the remaining cutout panels white. I still need to paint the rest of the outer skins.

Saturday, January 07, 2006

Finished Center Leg Rail Drilling, Finished Front Vents

I headed back over to Kelvin's to use the drill press, to finish drilling holes in the center leg rails, and the center leg itself. I was very happy with how it turned out. I did a loose-fit:



Later on I filed the upper front vent inserts a bit, and fitted the upper and lower vents into their respective surrounds. I guess I got a bit sloppy with the Super Glue. Oh well...

Friday, January 06, 2006

Started Painting for Real, Glued Up Front Vents

Another mini-milestone, I started painting some of the white panels today (using BriteTouch light gray primer and Rustoleum Satin White). The unpainted panel with the blue tape is to remind me that I'm not painting that particular panel on the back door, as some shots in Episode IV have this panel unpainted.



Later I glued up the internal front vents (well-camouflaged aluminum on aluminum).

Tuesday, January 03, 2006

Vent Surrounds Arrive

Wayne's aluminum vent surrounds arrived today, and they look and fit great! I Scotch taped Dave's lower vent inserts in for show, but I don't have the upper vent inserts installed.



I won't be able to do any building for the next few days, but hopefully I'll have something to report during the weekend.

Sunday, January 01, 2006

Cut Gas Pipe, Dremeled Back Panel

I started off today by cutting the gas pipe that connects the legs to size, using a jigsaw and a really nasty blade.



Then I gave the legs a test fit, which seemed to indicate success.



Next I marked up the center leg rails for drilling, but until I can get access to a drill press, I'll hold off on those.

Finally, I Dremeled out the back door panel of the inner skin. Frankly, I was surprised how straight I cut the skins here.





I sanded the sharp edges down afterward.

Well, vacation is over, and I didn't get as far as I had hoped, but I guess I'm not too surprised. I'll get this droid on three legs sometime soon.

Saturday, December 31, 2005

New Year's Eve Silliness

I did no building today, but I decided to put together most of my junk and dress R2 up for New Year's Eve.

Happy New Year!

Friday, December 30, 2005

Paint Test, Marked Rear Panel

Wow, I got almost nothing done today. Huh, how about that?

I did another blue paint test, this time by first sanding the scrap piece of aluminum, then two coats of BriteTouch Primer, followed by the Krider blue formula (except three clearcoats instead of four). The picture below shows today's test (left) vs. the one I did the other day (right). I know, they pretty much look the same, so why bother posting this picture?



I also marked up the rear inner skin for the back-panel cutout. I may attempt that tomorrow, we'll see...

Thursday, December 29, 2005

Center Leg Rails Started, More JB Welding

Another busy day. First I cut and secured the supports for the center leg rails.



Next I cut the rails themselves with a hacksaw (a laborious process to be sure). Then over to Kelvin's to use the drill press to drill the mounting holes into the rails.



Back home, I received the U-bolts and wheel axle bushings that I ordered from McMaster Carr, and Heath's aluminum foot strips arrived. Yea!

I wrapped up by JB Welding the rest of the back panel outlines to their corresponding panels. This was TED-I-OUS and kinda messy. Also ran another white paint test.

Wednesday, December 28, 2005

Paint Tests, JB Welded & Cut Styrene

I tried a couple of paint tests, of both R2 blue and white. For blue, I used Kelly Krider's famous formula (primer, Rustoleum Metallic Purple, DupliColor Anodized Blue, and Rustoleum Crystal Clear clearcoat, in that order). For white, I used the Rustoleum primer instead of the Brite Touch, and Rustoleum Satin White (same as earlier). I need to wait for both to dry to assess the results.



Next I had my first experience with JB Weld, even though I bought the stuff way back on May 29, 2005. I JB Welded one of the back door panels to its outline. I'm only JB Welding the back door parts, to allow for potential autographs on the inside of the back door.



At the end of the day I cut out some styrene to cover the exposed areas of the frame, on the right and left-bottom sides.



I also made a couple of trips to Home Depot and a trip to Rockler to pick up various parts (screws, rails for the center leg, casters for the center foot).

Tuesday, December 27, 2005

Dremeled and Drilled Frame

I started off the day by repeating some of the silicone exercise from yesterday for a pair of panels on the rear skins (the panels not included as part of the back door).

Next, I Dremeled out a few areas of the frame, specifically the rib supporting bottom of the coin slots (shown here), the rib above the front power coupling (not visible from this angle), and the area above the shoulder (seen in the next picture).



Finally, I made one of the cuts I had been putting off for as long as possible, due to my fear of messing it up. This was the drilling of the holes in the shoulder planks that the gas pipe connecting the two legs passes through. As far as I can tell, the holes line up just fine, but I won't know for sure until I connect the legs. The gas pipe needs to be cut down a bit too. The other hole that's visible is for electrical wires to pass through the shoulder and on down the legs to the feet.



By the way, yesterday's white paint test didn't turn out as robust as I had hoped. I was able to peel the paint and primer off the aluminum fairly easily with my finger nail. The paint did not come off the primer; rather, the primer and paint came off together from the aluminum. I did not prep the aluminum other than cleaning it with acetone. I hope to try a couple of experiments tomorrow, one with a different primer, the other with a light sanding and cleaning of the aluminum before applying the same primer as yesterday. We'll see how that goes...

Monday, December 26, 2005

Siliconed Panels, White Paint Test

Yesterday I just about finished drilling and countersinking the outer skins:



Today I started applying silicone to glue panel outlines of the outer skins to the panel cutouts of the inner skins. Don't worry, I cleaned up the mess.




I wrapped up by doing a paint test of Rustoleum Satin White on a scrap piece of aluminum from the skins. I applied two coats of primer first, followed by three coats of Satin White.

Friday, December 23, 2005

Frame, Skin and Resin Work

Today was a fairly busy and productive day.

I started out by routing off the tiny amount of the top of the frame that I had left above the area of the large data port. I thought I could/should leave it there, but I was wrong, so bye-bye it went. Here's the "after" picture:



The next thing I needed to do was enlarge the slot that I cut into the bottom of the shoulder planks to make room for the octagon ports (both front and back). I didn't leave enough room, which was bad, because now the frame is all glued up, and I had to use a hacksaw blade by hand to make this cut. Very tedious.



After that, on Mike Senna's advice I decided to widen the inner skins' octagon ports with a Dremel and the cutoff wheel attachment. This way, the octagon ports will sit flush against the outer skins, instead of the inner skins. You can see the "after" results in the background of one of the pictures below. Here's a "before" look:



Again on Mike's advice, I painted selected areas of the frame black. These areas might be seen from the outside. For example, if/when the utility arms open, that area will be dark. If I choose to sand and cut the octagon ports so that the ribbing on the back is cut like a web with openings, the background there too will be dark.



Next I sanded the resin power couplings using a piece of sandpaper face up, taped to a curved piece of one of the aluminum skin cutouts that maintains the overall radius of the skin curvature. I sanded the face of the power coupling against this curve, so that the power coupling will rest flush with the inside of the skins. Here's an "after" look:



Finally, I cut out and glued together the top of the door frame for the back panel. It ended up being a little thicker than I intended, but it should be okay. I can always route it down if need be. I haven't decided if I should make side door frame strips, or just hold the door on with brackets and screws.

Wednesday, December 21, 2005

Drilled Inner Skins

I finished drilling and countersinking the inner skins tonight, for the screws that will attach them to the frame. Next up, drilling the outer skins, which will require great care, since these will show to the outside world.

Saturday, December 17, 2005

Frame Glued Up(!), Started Skin Attachment

Mike Senna was kind enough to let me come by again, so I could receive much needed guidance and assistance on the big frame glue-up, and the start of the skin attachment.

We both worked the glue bottles and got the frame glued up lickety-split. I thought this would be an iterative process, using clamps and grips to hold parts of the frame together. Instead, we just worked through the entire frame in one shot, glueing up pretty much everything except the tall wooden shoulder planks, and the pie wedges that help hold them in place. (The shoulder planks will be glued after the shoulder hole has been cut, the pie wedges won't even be glued at all, believe it or not.)

After gluing, we used some of that really strong tape with the threads in it, and stuck it at the top-, middle-, and bottom-side areas of the skins on each side, and stretched the skins as tight as possible around the frame. We pretty much got a perfect fit, and we let the glue set for a couple of hours.



Next, we ensured the alignment of the skins to the frame was as good as possible, and then Mike showed me how to drill and countersink the holes for the screws that attach the skins. Only two holes on the front inner skin so far, but that's enough to get me started.




If that wasn't enough good R2 news for the day, Dave Everett's center internal vents arrived today too.

I'm on vacation until the New Year, so I'd like to get the skins all attached and painted, and the legs attached as well before vacation ends. Here's hoping, anyway.

Wednesday, December 14, 2005

Filed Down Skins

One of the tedious parts of working with the aluminum skins is the filing down all the tabs that hold the various panels in place. I counted a total of 76 unique pieces in my set of aluminum skins, once all the pieces had been separated and filed smooth where needed. Still, I love the aluminum skins! They are now ready for primering and painting. (No picture, too boring.)

Monday, December 12, 2005

Finished Cutting Skins

I finished cutting the skins tonight:



Earlier in the evening I picked up lots of paint and primer for the skins.