Sunday, December 11, 2005

Routed LDP Area, Sanded Resin, Started Cutting Skins

I routed out the area of the frame that contains the Large Data Port (LDP), and did a test-fit:




While I was working on the frame I also trimmed a couple of ribs and the shoulder planks (no pictures posted for this), to better accommodate the octagon ports.

Speaking of the octagon ports, I flipped the belt sander upside-down, secured it, and went to work sanding away. I figured resin dust is probably not a good thing to breath, so I wore a mask along with the goggles and ear protection. I sanded them down to the point that there was only about 1/16" extra overhang. I may hand-sand the rest, or I may leave them as-is. I haven't decided. See More Resin Parts for a "before" look.




Finally, I started cutting out parts of the aluminum skins with a hacksaw blade. Still much more to do, I've only gotten started.

Saturday, December 10, 2005

Finished Main Skirt Build, Routed Frame

I finally finished the main skirt work. All that remains is a bit of filling in of small gaps here and there, and painting the thing.

This would be a pretty misleading weblog if I just showed the stuff that went right, because lots of things go wrong (seemingly more often than not). Remember those wooden dowels I used for the ribs? Well, routing them down with the router table didn't always go so well. These ribs below were literally ripped from the skirt as I tried to route them:



So I remade a few ribs, and for those that were already glued on, I cut them down with a hacksaw (which lead to sloppy results). The ribs that came off were remade and cut to size before gluing.



Here's how the skirt turned out. I may one day redo the styrene and the ribs, but for now, this will do. (That's my upside-down frame in the background, for reasons that are about to become clear.)



Next I returned to my long-neglected frame. Now that I have the resin power couplings and octagon ports, I am able to mark up areas of the frame that need to be routed out to accommodate these parts. So I turned the frame upside-down and pulled off the still-loose base plate and started marking away:



Then I routed the marked areas. Below is the area for the center-front power-coupling:



I did several test fits of the resin parts as I went, adjusting the depth of the router bit and area being routed as necessary. Here's the final fitting:

Sunday, December 04, 2005

Started Gluing Skirt Ribs

I started gluing the skirt ribs onto the curved styrene part of the skirt today. I also tried routing the ribs down to size (on the other side of the skirt in the photo below), but I ended up mangling a few of the ribs due to poor feeding into the router, and the fact I didn't let the glue dry long enough. So I'll let these dry for a day (or a week, or whenever I have enough daylight to use the router again) and try again.

Saturday, December 03, 2005

Finished Prepping Router Table, Glued First Skirt Rib

Between applying coats of primer to the legs, I finished my router adapter plate for the router table, and set up the router table to be able to trim the overhang of the skirt ribs:




Next I glued the first skirt rib for a test run of a trim with the router, which I will do tomorrow. The idea is to turn the skirt upside down, and let the spinning router bit trim the overhang of the rib, flush with the top of the upside down skirt (technique courtesy of Mike Senna).

Friday, December 02, 2005

Feet Arrive

The budget feet I purchased from Anna arrived today (box 1 of 2 so far):

Thursday, December 01, 2005

More Resin Parts

Another outstanding batch of resin parts arrived from Keith today. The order was comprised of pairs of octagon ports, power couplings, inner & outer half moons, leg struts, and a coin slot strip. Thanks again, Keith!

Sunday, November 27, 2005

Skirt Ribs - Third Try's the Charm

Let's see... First I tried using 1/4" MDF strips 1/2" wide for skirt ribs, but they ended up being too short. Then I tried 3/8" square dowels, but they ended up being too tall and narrow. What to try next?

I took 1/2" square dowels and trimmed them in one of the dimensions to a little less than 3/8", leaving them 1/2" wide in the other dimension, as the blueprints suggest. First I had to trim the dowels (carefully and safely) using the table saw:



Next I cut the steep angle that rests up against the bottom of the skirt:



Then I cut the other angle that runs parallel with the top of the skirt. This will be cut flush with the top of the skirt later using the router to shave off the part that rides above the top of the skirt:



Finally I primered them, along with the legs that I had been sanding and primering throughout the weekend:



I just need to glue the ribs on and route them down to size. May need to sand the inboard parts of the ribs to make them fit the skirt snugly in places too.

Saturday, November 26, 2005

More Primering and Sanding, Recut Skirt Ribs

Just like puttying and sanding, the primering and sanding will go on indefinitely. Still trying to get the legs ~100% smooth. I also tried recutting the skirt ribs, with trials using 1/2" square and 3/8" square dowels to see if they would align with the skirt base better. The 1/2" dowel was much too large, the 3/8" dowel was just a touch too tall, but 1/8" too narrow to spec. I may try cutting some of the 1/2" dowels down to just under 3/8" in one of the dimensions to see if I can get it just right.

Tuesday, November 22, 2005

Started Primering Legs

Wow. After all these months of staring at wooden legs, I finally started applying primer to them. As odd as it seems, I consider this quite a milestone. Here's the before/after:




Michael McMaster's excellent C3 DVD set also arrived today. :)

Saturday, November 19, 2005

More Primer, Wood Hardener, Skirt Work, etc.

More primer on center leg. Applied Minwax wood hardener to left and right legs, thus declaring the base form of the legs COMPLETE. Filed styrene on skirt to be more level and more aligned with the wooden siding. Drilled holes for router table adapter I'm building.

Thursday, November 17, 2005

Primered Skirt Ribs & Other Detailed Work

This morning I put a coat of primer on the skirt ribs, and a second pass on the center leg. Got home, sanded down the primer with 400 grit sand paper, and did another round of primer. Finished marking up base plate of frame where routing needs to take place to make room for various details (power couplings, octagon ports, coin returns, pocket vents).

I ran a test of the Minwax wood hardener on a piece of scrap with Plastic Wood coated on one edge (similar to the legs) and it seemed to work, so I think I will try the wood hardener on the edges of the legs with Plastic Wood as well as the sides. I do want to make sure the wood hardener handles a coat of primer well first, though.

Let's see, what else? Well, I need to file the styrene on the skirt, as I did my first setting of the frame on the skirt, and it was evident that the top of the styrene was hitting the bottom of the frame too high in places. Who knows, I may even redo the styrene if I'm too unhappy with it, but let's see how the filing goes first.

Sunday, November 13, 2005

Sanded/Puttied Legs, Cut Skirt Ribs

The end is near for the sanding and puttying of the legs. They are just about done (really). Here's a so-so look:



Next I cut the ribs for the skirt:


Saturday, November 12, 2005

Sanded Legs, Glued Styrene on Skirt

I spent the morning sanding the legs where I added lots o' Plastic Wood wood filler. Legs may be done with puttying and sanding real soon.

Spent the afternoon working on the skirt, mainly gluing the styrene onto the wooden skirt (primered in gray). Here are a couple of views, upside-down and right-side up. (Yeah, a little bit of newspaper stuck to the glue in one corner, I'll sand that out.)


Monday, November 07, 2005

Finished Cutting Styrene for Skirt

I finished cutting the curved styrene parts of the skirt tonight. As you may have guessed, it isn't easy to get these perfect, and mine are still not 100% perfect, but I think they'll do.

Right now they're taped on. I still need to glue them in, and cut and glue the ribs that go on the styrene.

Reorganized Web Page

Okay, even I thought the web page was getting out of hand. So rather than show every post in history, I've changed the front page to only show the last 30 posts. All posts are still available by clicking on the various monthly archive links on the right.

Sunday, November 06, 2005

Dremeled Skirt, Recut Armpit MDF, Puttied Legs

I used the Dremel to grind off a bit of wood on the inner part of the skirt where the Styrene will need to rest. Next I recut some of the MDF pieces that will fit in the armpits. Finally, I decided to take the pluge and apply a (somewhat uneven) layer of Plastic Wood to each of the legs' edges. I only covered about half of each leg, I'll sand and cover the other half next.

Saturday, November 05, 2005

Worked on Skirt, Primered

I sanded the putty touch-up on the skirt, and then proceeded to start applying primer to the skirt frame and center leg. The primer does really show where I missed covering up the wood grain, so I may experiment to see if I can post-primer putty.

I worked on the armpits of the legs some more, using the drum sander Dremel attachment to smooth them out. I think they're just about ready.

Finally, I cut out a second curved styrene piece for the skirt, although it needs to be trimmed to length.

Oh yeah, and I picked up another R2 toy at Costco today! :)

Friday, November 04, 2005

Curved Styrene Skirt Cut

I gave a shot at cutting out the curved part of the skirt, which I am making from styrene, per Mike Senna's tutorial. The result was pretty close to being correct, but I'm going to give it another shot tomorrow. I need to make two of these total.

Monday, October 31, 2005

Horseshoes Arrived

Happy Halloween! Andy and Alex' layered shoulders (aka "horseshoes") arrived today! The aluminum pieces are the ones that I received from Ryan, back on June 27, 2005.

Sunday, October 30, 2005

Finished Gluing Skirt Supports

I glued in the four supports for the sides of the skirt today. Too many pictures of virtually the same thing, so I'll forego pics today.

Saturday, October 29, 2005

Skirt Box Routed, Sides Glued

Today I routed the rectangle where the middle leg will lead through the skirt flush with the box built above and around it. I also glued on the sides of the skirt that will be visible from the outside. I still need to glue some more supports for these sides, and obtain some styrene for the curved part of the skirt in the front and back.

Tuesday, October 25, 2005

More Skirt Gluing

I glued most of the supports for the skirt today:

Monday, October 24, 2005

Skirt Center Box Glued

Tonight I glued up the box that goes around where the center leg enters the bottom of the skirt. Short and simple.

Sunday, October 23, 2005

Skirt Cut Outs

I was able to spend a fair amount of time today cutting out various elements of Mike Senna's skirt design. First, I sliced the straight parts of the base circle that I cut out yesterday. Next I cut out the sides for the box that go around the center leg opening, including angle cuts on the corners. Then I cut a series of supports, some vertical, some horizontal. I also cut the MDF for the skirt ribbing. Finally, I cut the side supports that serve as the sides of the skirt and will be visible from the outside. Nothing has been glued up yet.

I still need to cut the MDF strip into 12 pieces for the ribs, and make angle cuts on them.

Saturday, October 22, 2005

Glued Side Tape-Ease Cylinders, Started Skirt

I glued on the Tape-Ease cylinders to the side legs today. Then I got a late start on working on the skirt, following an advance look at the tutorial that Mike Senna has put together. All I got done was the cutting out of the base circle, and the marking up of where the center leg hole will be, and the angles that lead to the side strips of wood on the edging of the skirt.

Friday, October 21, 2005

Finished Sanding Cylinder Corners

I sanded both sides of the center leg where the angled Tape-Ease cylinder meets the leg. I know, it ain't 100% perfect, but pretty close. I think I'll primer it and see how it looks.

Thursday, October 20, 2005

Puttied Cylinder Corner II

Sequel to yesterday. I sanded the puttying I did yesterday, and did a bit of touch-up. I next puttied up the reverse side of the center leg of the Tape-Ease cylinder MDF section where it meets the leg.

Wednesday, October 19, 2005

Puttied Cylinder Corner

I added some Plastic Wood putty to where the MDF that is attached to the Tape-Ease cylinder meets up with the center leg (I only did one side, will do the other side next). This was necessary because I goofed when I glued the MDF onto the cylinder section. Obviously I still need to sand this mess.

Sunday, October 16, 2005

Finished Grooves, Marked Frame, Glued Center Cylinders

The title sounds like I was more productive than I actually was. I did manage to finally fix the grooves circumscribing the outer legs, and they are in good alignment all the way around now. Half-way done with the first side-of-the-leg cut here:



I am starting to revisit the frame that I haven't touched since, what, mid-July? I will need to route out certain areas to accommodate parts, such as the Large Data Port, Octagon Ports, Power Couplings, and Coin Returns (there will be a few other spots too). So I've started to mark the areas of the frame that will need routing.



Finally, I glued on the Tape-Ease cylinder area to the center leg (both sides). Because of a goof-up that I noticed a while ago, I will need some putty to finish the corner where the sloped area meets the leg.

Saturday, October 15, 2005

Finished Armpits, Recut Grooves

I finally finished chiseling out the armpits. I'll need to recut the 1/8" MDF that goes in there, as the original pieces are now a bit too small for the larger space into which they will fit. I also recut the ankle grooves. They are very much in alignment now, although a portion of one groove is cut a bit too deep (probably repairable with putty). Need to putty up the nicks here and there, and use a hacksaw to cut edge grooves.

Friday, October 14, 2005

More Armpit Digging

After several days of having no time available to work on R2, I managed to squeeze in some time today to continue working on chiseling out the armpits for the stabilizers. One leg is done, the other needs a little bit more work. Still to do: Recut grooves around leg, fix up minor nicks during chiseling, and glue on the Tape-Ease cylinder section. And this is just for the inner leg. Nothing started yet on the outer leg (although I did order Andy's styrene horseshoes, and I already own the aluminum shoulder buttons and hydraulics).

Saturday, October 08, 2005

Routed Cylinders, Dug Out Armpits

(How's that for a blog title?) With Kelvin's help yet again, we routed the overhang of the MDF on the Tape-Ease cylinder. Some sanding and puttying and more sanding later, and this area will be done(!). Also worked on the area in Artoo's "armpit" where the shoulder stabilizer will go. I needed to make this a bit deeper and more rectangular. I inset some 1/8" MDF for a smoother surface (not glued in yet). I only got about 1 1/4 out of 4 of these dug out. Used a Dremel and a chisel. Very slow and tedious.


Tuesday, October 04, 2005

Angle Cuts Covered, Grooves Filled

I jigsawed a rough cut of the covers for the angle cuts for the covered portion of the Tape-Ease Cylinder. These will be routed down to size using Mike Senna's (un)patented routing technique. I also decided to bite the bullet and fill in some of the grooves on the legs and try redoing them (soon, hopefully). Almost none of the grooves on each side matched, save one.

Sunday, October 02, 2005

Tape-Ease Angle Cuts

Again thanks to my buddy Kelvin, we were able to make the 55 degree angle cuts on the round part of Artoo's ankle. We had to create a custom jig onto which we clamped the cylinder arcs, and then we were able to make the cuts by clamping the cylinder arc along side the sled.


Saturday, October 01, 2005

Sanded Cylinder to Size

Sanded the Tape-Ease cylinder wedge to size, by inverting a belt sander and running the edges of the arc along the sandpaper until the arc was of the proper size. Got stuck trying to figure out how to slide the cylinder along the table saw to make the 55 degree cutout it requires. Will hopefully resolve that tomorrow.

Friday, September 30, 2005

Tape-Ease Cylinder Cut

Finally! The Tape-Ease cylinder was cut with a band saw, and now I can finish he lower part of the legs. I need to cut one of the ends of the cylinder at a 55 degree angle, and then cover it with MDF. I also (what else?) did more sanding and puttying of the legs. Although you'd think the legs would be mostly putty and sand paper by now, they're not.

Thursday, September 29, 2005

More Leg Work

The leg work never ends. In my quest for as smooth a finish as possible, I did another round of sanding and gooping of putty. Will sand again tomorrow. "Will this suffering never end?"

Wednesday, September 28, 2005

Dome Arrived!

September 28. That date never meant much to me. School starts... brush fire season... days get shorter... But September 28, 2005 now ranks as an annual holiday, for today is the day I received my dome! The box was somewhat beat up, but thankfully the contents were in excellent condition, with no damage whatsoever. I was expecting a known defect at the top of the dome, but that was not present. All in all, a very happy day!

Tuesday, September 27, 2005

Sanded Cylinder Holder, Purchased Protractor, More Leg Work

I (hopefully) finished sanding the grooves in the ankle cylinder holders. Went to Home Depot, looking for wood hardener and a protractor. Found both, but the wood hardener (Minwax) had all but a skull and crossbones on it warning how many ways it could harm you. Since it said it was mainly for rotting wood, I passed. Wrapped up by going over the legs with Plastic Wood one more time, for (again hopefully) a final sanding. I still may refill in the groove in the legs and try again for better alignment, haven't decided.

Monday, September 26, 2005

Sanded Cylinder Holder, Purchased Router Table

Spent a little time after work sanding a groove into the Ankle Cylinder Holder, as called out by the blueprints. Will hopefully wrap that up tomorrow. Also bought a router table and adapter for the Porter Cable router at Sears.

Saturday, September 24, 2005

R2LA III

What can I say? R2LA III at Mike Senna's place was a blast! It was the Superbowl of R2 events (this is coming from a guy who missed C3). Over 40 people showed up, six complete R2s, lots of veterans, some newbies (ahem), and a helicopter fly-over! Loved every minute of it. Thanks Mike and Amy!

Saturday, September 17, 2005

LEDs Arrive

The blue and white LEDs I purchased from a seller on eBay arrived today. Hard to tell if the LED below is blue or white due to the camera flash! (It's blue, by the way. Everything but the LED looks awful without the flash, so I went with the flash pic). Also picked up a multimeter.

Wednesday, September 14, 2005

Lights Are Blinking!

Hooray! I started touching a multimeter to the power connectors, and found a bad solder joint on the 9-45v pin. Using a thumbtack (temporarily) completes the connection, and LEDs are blinking!

Tuesday, September 13, 2005

Finished Soldering Prototype LEDs

The good news: I finished soldering up the PIC flasher kit. The bad news: Nothing blinks. I have absolutely no idea what's wrong. More than likely I have one or more bad solder points. I've tried powering the thing with a single 9v battery and also four D cells in series, no luck. Very discouraging, and right now it looks like six hours and twenty bucks down the drain. (I know, the picture below shows two empty IC sockets, but they have since been populated correctly.)

Monday, September 12, 2005

Started Prototyping LEDs

Today I dusted off what little soldering experience I have, and started soldering my PIC flasher circuit that I ordered from Carl's Electronics. Soldering was a bit sloppy, but I think I haven't shorted any leads yet. I had to stop when I found that the package swapped 8 of one resistor type with what should have been 1 of another. I have two more kits to work with, but this was a good stopping point anyway.

I also picked up a soldering iron stand and desolder bulb at Radio Shack.

Sunday, September 11, 2005

Recut groove

After somewhat botching the alignment of one of the grooves on the left leg yesterday (and subsequently filling the groove in with putty), I recut the groove to better align with the adjoining edges.

I also bought a soldering iron, solder, battery case, breadboard, 555 timer and wire at Radio Shack.

Saturday, September 10, 2005

Leg Grooves, Cut Tapease Cylinder

After several days of sanding and puttying the legs to get them smooth, I cut grooves into the legs where they belong. Well, almost where they belong. They don't all align perfectly, so I am going to fill at least one groove back in with putty and try again to get them to align.

I also practiced cutting the Tapease cylinder. My technique and results show more practice is needed. All in all a pretty disappointing day, as my results fell far short of the goal.



The LED kit arrived from Carl's Electronics. I had ordered three kits.

Sunday, September 04, 2005

Putty, Sanding Legs

Worked DAP Plastic Wood into leg grooves and little holes in the plywood, and gave the legs a sanding after it dried.

Saturday, September 03, 2005

Cut Cylinder Holders

Today I built of the easier parts to construct, the ankle cylinder holders, which look like little wedges underneath the ankle cylinders. Not even picture-worthy.

Also picked up some replacement gas pipe at Lowe's. The good news is that the 3/4" pipe fits cleanly into the 1" pipe. The bad news is there was an elbow joint stuck on the 1" pipe, and since it's the only one that made a good fit, I had to buy it like that (and pay about two bucks for the elbow) and now I have to figure out how to get it off!

Thursday, September 01, 2005

Keith's Resin Parts Arrive

Keith Henry's excellent resin parts arrived. First and foremost, the radar eye (shown with Azman's lens), along with another set of ankle cylinders and wedges, and the ankle details. Thanks, Keith!