Tuesday, January 13, 2009

Finished Cutting Groove on Left Ankle, Cut Another Motor Mount

Tonight I had a little time to finish cutting the groove above the left ankle.

First I strapped everything down.



Then I got to work cutting. Half way there...



I moved the block and cut the other half, and then repeated the process for the bottom side.



My aluminum arrived from discountsteel.com yesterday, so once I was done with the ankle groove, I decided to cut a replacement motor mount for the left drivetrain.




The joke might be on me (again), as the original motor mount might still work for my purposes. I need to find some time to do some minor Dremel work on the left battery box and see. Either way this piece won't be wasted though, as I will need a pair of motor mounts for droid #2's drivetrain.

Sunday, January 11, 2009

Finished Cutting Groove on Right Ankle

Today I only had a few minutes to get any work done, so I worked on finishing the groove that goes around the area above the right ankle.

Clamps every which way help secure the work.



As with droid #1, I used a block of wood to provide a guide for sawing with the hack saw.




After I cut half of the width of the groove, I realigned the block and cut the other.



I repeated for the other side of the leg.

I cleaned up the cuts with some sand paper, and I think things are just about good.



Hopefully I can get some work in this week, but it's been difficult to find the time recently. I also need to call discountsteel.com and try to figure out why my aluminum hasn't shipped out in the week since I've ordered it.

Sunday, January 04, 2009

Finished Evercoat for Outer Legs

While I wait on buying more aluminum L channel, I decided to try finishing up the Evercoat work on the legs. Just a few small spots needed very minor filling on each of the outer legs



I lightly sanded with 220 and 400 grit sand paper, and they are done and ready for primer, although I will first cut the grooves on the sides of the legs to match those already cut on the front and back faces above the ankles.



After the primer, I will inspect for any other blemishes, and fill as necessary. Hopefully very little, if anything, will show up. I still need to do the middle leg, I'll work that in along with the drivetrain work sometime soon.

Saturday, January 03, 2009

Right Drivetrain Fitting Work

Time to make the new drivetrain fit the existing foot shells and battery boxes.

Here is how the motor mount currently resides in the foot shells. Notice that it is resting directly on top of the foot shell ledge, so there isn't any room for the battery box to fit underneath. This isn't the biggest problem in the world, as a small section of the battery box could be cut out, although a very small section of the bottom of the motor and motor mount would theoretically be visible, to ground-based insects, at least.



I started off by Dremeling out as much material as I could without having a gap be visible, so that I could test-fit the battery box and see what kind of adjustments I could make in order to get the motor and motor mount to be completely concealed within it.



There is a little amount of headroom at the top of the inside of the battery box. I decided that I would recut a new motor mount, with holes drilled to raise it about 1/8" above the ledge of the foot shell.



I had a spare L channel piece to use, so it was time to cut it to size. Less yackin', more hackin'!



Before I could drill holes in the new piece, I needed a scrap piece of aluminum from which to make a template. I cut one to size, clamped the existing motor mount to it, and drilled through the holes on the existing motor mount, and into the scrap piece, thus forming the template pattern for the holes.

I measured where to drill the holes on the new motor mount, and clamped the template piece to it, and drilled the new holes.



The new motor mount does indeed clear the foot shell ledge by about 1/8", allowing the battery box to sneak underneath. I drilled some extra holes in the motor mount to reduce weight. If I didn't know any better, I'd swear that I messed up and clamped the template piece in the wrong direction and had to drill twice! ;-)



I also had to file off a fair amount of material from the top of the NPC motor case.



Success! This took all afternoon and some of the evening, but I was able to get everything to fit.



Now I get to try the same thing on the right foot. I don't have any more L channel. I will either order some from discountsteel.com (where they can pre-cut it to size) or pick some up and the local Industrial Metal Supply, depending on how lazy I am.

Wednesday, December 31, 2008

Drivetrain Build Completed

At long last, after one more visit to Mike's, my new drivetrains are done (or 99% done). We shot some video that supplements the R2LA VI DVD drivetrain tutorial, it can be fount here:

Part 1
Part 2

I used the Dremel cutoff wheel to trim the motor mount bolts to size to avoid having them interfere with the chain, and I needed to cut down the bolts that secure the motor to the motor mount as well.



Next, I took the plunge and drilled out the 1/2" ankle bolt holes for the channel pieces.




The ankle bolt holes will house a 1/2"->3/8" bushings, and these bushings need to be ground down a bit, as they are longer than the channels' wall thickness.



The drivetrains are pretty much done, other than having the bushings pressed in, and having the channels painted white.



Now comes the inevitable fight to get the motors to fit into the battery boxes. Also, these motors only run on 12 volts, whereas my droid currently supplies 24 volts to the motors, so my power needs to be adjusted. As I'm running out of vacation time, I'm not sure how soon I'll get to those tasks.

Tuesday, December 30, 2008

Drivetrains Nearing Completion

The finish line is near (or in Mike's case, behind him). Today was another long day working on the drivetrains, but things are coming to a close.

I started off by hacking through a total of six inches worth of steel axles.




Meanwhile, Mike was busy figuring out precisely where to locate each motor mount piece. This is crucial to the success of the drivetrain. We plan to shoot some addition video on this tomorrow, to supplement the drivetrain tutorial on the R2LA VI DVD. We'll probably upload it to YouTube.




Once the motor mount locations were determined, they were marked and each of us drilled ours.



Each of us trimmed the motor mount overhang on the band saw.



I worked on the chain for the drive side of each drivetrain. When it came to tensioning the chain, we decided to shim the motor away from the motor mount and closer to the gear on the wheel axle, rather than attempt to mill slots with a non-existent mill. This was a time-consuming, iterative process. Both of my motor mounts have a 1/32" shim layer between the motor mount and the motor, which provides a little slack in the chain.



Mike drilled the ankle bolt holes in his top channel. I wasn't ready to drill the ankle bolt holes just yet, as I needed to measure the holes on the existing H&A drivetrains, and have the new holes match.



By the end of the evening, Mike had his drivetrains fitting perfectly inside his foot shells. All he needs to do is trim the bottom of the battery boxes slightly, and he will be completely done. I still need to cut some bolts down to size, and have the ankle bolt holes drilled, along with needing to trim some of the bottom of the battery boxes. Getting close!

Monday, December 29, 2008

Drivetrain Channel and Motor Mount Work

Back to work on the drivetrains. As we get closer to the finish, we must proceed even more carefully. This is particularly true when working on the motor mounts, as space is very tight, and a mistaken measurement or drilled hole can mean quite a setback.

We started with marking and drilling the channel pieces that go on top of the drivetrain.




Once the channel pieces had their holes drilled, they were used as templates to drill the holes into the tops of the drivetrain body pieces.



After those holes were drilled, we returned to the drill press to countersink the holes in the channels.



Next, it was time to move onto one of the trickiest parts of the build, the motor mounts. These segments of L bracket need to be located just right, both vertically and horizontally. We want to locate them as low as possible, to give the NPC motors as much room up top as possible in the battery boxes. In the horizontal direction, we must be mindful not to block access to the ankle bolts when the motor is installed, and yet leave as much distance as possible for the chain to span the gear on the motor and the corresponding gear on the drivetrain.

Mike spent quite a bit of time determining where best to locate the motor mount on the drivetrain.



Once the location was determined, he used a piece of paper as a template to match the hole locations on the NPC motors.



Mike transferred the paper template to the motor mount piece, and used it to mark up the piece for drilling.



Perfect on the first try, all four holes that were drilled lined up with the four holes on the NPC motors.



Speaking of the NPC motors, we came to the realization that the tops would need to be ground down somewhat, to accommodate the curve at the top of the battery boxes. Before grinding, we wanted to make sure we knew what we were grinding into, so Mike took the cover off the NPC motor. (By the way, don't do this yourself unless you want to struggle with getting springs and commutators back into position, which is quite a pain.)




Next, the holes for mounting the motor mount onto the drivetrain were drilled.



Now the motor mount is attached to the drivetrain.



Here is the drivetrain in its current state, very close to being done.



It fits well in the foot shell, the battery boxes will need some (hopefully) light trimming.



Of the original six drivetrains, two of my four will be put on hold because I still need to build my A&A foot shells before proceeding. We went very slowly and carefully on today's drivetrain, we are hopeful the other three will go more quickly. Beside what we did today, we still need to build up the drive-side chain, mill out some space to tension the chain on the drive side, and drill the ankle bolt holes.

Sunday, December 28, 2008

Final Drivetrain Assembly Started

Back to work on the drivetrains!



Yesterday we did some cutting and fitting and some rough assembly. Today we started doing final assembly on some of the parts of the drivetrain. Final assembly includes fun activities such as lightly sanding and lubricating shafts, Dremeling out and cleaning flanges, and sanding key stock.




Sparks! Mike is not cutting the keyway here, he's just clearing some debris that was stuck in the keyway in the axle.



Here is the mysterious keyway in action. A slot is cut into both the axle and the gear. A segment of 1/8" square rod is placed into the slot on the axle, and the gear slides over it, locking the gear to the axle. This way, the gear won't ever slip. Set screws on the gear also help hold the gear onto the axle.




Likewise, the Delrin ring inside the wheel hub also has a keyway cut into it, and this locks the wheel onto the axle as well. A washer is located on each side of the wheel, inside the drivetrain body. The washers virtually eliminate friction as the wheel turns inside the drivetrain.




This looks a lot like yesterday, but yesterday was mainly prep for today. Today we now have the keys in the keyways, the wheels and washers installed, and the large gear mounted.



The motor mounts are probably the next item of business. These will be tricky, because we need to get everything to fit into our existing foot shells and battery boxes.