Tonight I started the task of mounting the electronics on the new electronics board for droid #2.
I spent quite a bit of time loosely laying out various configurations, before settling on a placement that I hope will work well.
Time to start drilling. I used various parts as templates for where to drill.
The attachment for the speed controller.
The large hole for connectors to pass through.
Using the dome controller mount plate as a template.
Finally, I used the mounting holes on the Stealth hardware as a guide to mark where to drill, and then drilled the three holes for the DC converter, and the four holes for the Stealth Receiver.
For the Stealth hardware, I'm using #4 screws from underneath, and nylon standoffs and nuts, in order to avoid having metal contact metal. Also, I chose longer screws in case I decide to cover these electronics with plexiglass.
The electronics board, as it currently stands. Loose wires will be cut to size and soldered and/or attached to their mount points, which should help clear up the clutter.
And the electronics board, as I hope to have it in the next day or two.
Subscribe to:
Post Comments (Atom)
3 comments:
Looking good! :)
Thanks Ed!
Post a Comment