Unlike last year, I didn't have an April Fools joke for this year.
It was a busy day, but still not enough hours to do all that needs doing.
I started off by finishing the wood cuts on the center foot. I found that I needed another 1/2" of plywood to make everything work. I also have the casters sticking out further than half way from the bottom of the foot. I'm not sure if that may present any problems, but I don't think so.
I had to glue up that last 1/2" of plywood, so I hope to screw and bolt everything together once the glue dries.
Next, I turned to the enjoyable task of filing steel. Four axles and three shaft adapters need two flat spots each, to accommodate the set screws for the gears and wheels.
I applied primer to the half moons today. I was also going to prime the foot shell doors, but I didn't get around to it. All I did for those was rough them up with sand paper.
I wrapped up by installing the foot strips on all the feet.
For the front strips on the outer feet, I taped each foot strip in place and traced the circles for the knurled cable fittings with a pencil, to indicate where to drill.
I used a 5/8" Forstner bit to cut out the circles.
For the foot strips on the backs of the outer feet, and for both foot strips on the center foot, I drilled and tapped holes for #4-40, 3/8" machine screws. Those foot strips are screwed in from the inside.
I likewise drilled the foot shells, but I let the screw itself do the tapping into the PVC.
One step closer.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment