Sunday, January 29, 2006

Drilled Gas Pipe & Rail, Fitted Bushings

I drilled the gas pipe to fit two bolts into it to tie the legs together.



Later I drilled the vertical rail to accommodate the U-bolt that will pass through it. I also fitted the bushings inside each of the ankles (outer and center). Lastly, I attached the casters to the center foot.

I almost got R2 on 3 feet today, but the casters on the center foot were placed too close to each other, and the center foot construction may be too tall with the 3" caster wheels (plus stand) attached. I may need to remake the center foot, or modify it somehow.

1 comment:

pvc pipe connectors said...

It’s in point of fact a nice and useful piece of information. I’m happy that you simply shared this helpful information with us. Please keep us informed like this. Thank you for sharing.