I was able to drill the aluminum channel and secure the top utility arm today. Recall that the rod running through the pivot point of each utility arm is held in by MDF and aluminum channel. The MDF and aluminum channel both have half of a 1/8" circle drilled out of them (thus making a circle), in which the 1/8" rod rests. The two materials squeeze together around the rod.
Hopefully I can make some progress on the bottom utility arm tomorrow.
Tuesday, June 13, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment