After taking a day off so I could do battle with a toilet (which is currently at a standoff), I returned to work on the aluminum foot shells on droid #2.
The left foot shell just has one edge of slots remaining to be filled.
On goes the JB Weld. I assure you I am not recycling pictures from the last few days.
Repeat for the right foot shell, which has two sides remaining (well, one after tonight). Clean up the excess JB Weld with a razor blade, and let it dry overnight.
One more edge to go.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment