Tonight I finally got around to at least starting to glue down the shoulder planks into their slots. These really don't move much at this point since everything else on the frame is glued up, and there are four short dowels that lock them in place. Nevertheless, until tonight, they hadn't been glued down.
I glued around all four bottom sides of each planks.
Soon I'll glue the top sides of the planks in place.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment