The left foot shell has had an annoying sag on the side where the battery box rests, so tonight I made an attempt to address it.
I cut a couple of 1.25" segments of angled aluminum to support the foot shell on the drive train channel.
Next, I scuffed up the surfaces that will be JB Welded together with 60-grit sandpaper. Then I cleaned the surfaces thoroughly.
Into the dip it goes!
I clamped all the work down to dry overnight. I also clamped a piece of board along the top of the drivetrain channel, in order to align the new wing pieces with the top of the channel
Tomorrow I'll give it a try and see how it worked.
Tuesday, June 09, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment